Copenhague AGT (Denmark)

The first three phases of the Copenhagen Metro were opened in 2002 and 2003. In view of the success, it was decided that work continue on a fourth phase : a city circle line (Cityringen).

The underground line will be 15.5 km long and will serve 17 stations including major areas of the city of Copenhagen. A round trip is expected to take 23 minutes.

Together with joint-venture partners COWI and ARUP, SYSTRA has won the tender package for civil works. SYSTRA is providing civil engineering expertise for tunnelling and underground structures as well as project management (document control, interface management).

Key figures :

  • Length : 15.5 km
  • Number of stations : 17 (underground)
  • Total cost : 2 billion €

Key dates :

  • 2007-2008 : conceptual design
  • 2008-2009 : tender design
  • 2009-2010 : contract negotiation
  • 2010-2018 : construction